CASE STUDY –
AHU Evaporator Fabrication and Renewal Scope..

The Problems & Concerns;

  1. AHU Evaporator Coil not operating well
  2. Evaporator coil supply & installation
  3. Removal of old coil
  4. Supplying of new unit
  5. Installation of new unit

The Findings & Solution:

After running through an inspection and following our 5 Steps Formulation, the AHU’s evaporator coil was showing signs of fatigue. There are also internal leakages which could not be seen from outside were also identified.

Solution proposed was to install a new coil which was customized fabrication according to the ship requirements.

Most importantly, the installation process was completed within 24 hours.

DOWNLOAD NOW AND SAVE IT TO YOUR DESKTOP FOR FREE!

In this case study, we show you how Roger International identified the vessel’s HVAC issues and resolved them thanks to an organized working process.