CASE STUDY
Fabrication & Renewal of Evaporator Coil by hongkong riding crew squad..

The Problems & Concerns;

  1. Low AHU Performance
  2. Fabrication of new evaporator coil
  3. Removal of old coil
  4. Commissioning of AHU plant
  5. Configuration of PLC

The Findings & Solution:

We replaced the old evaporator coil, our team of engineers had to temporary cut the bulkhead to remove the equipment.

After all operations were conducted, testing deemed the new installations fully functional.

Moreover, the installation process was completed by our Riding Crew in Hongkong.