CASE STUDY – Major HVAC Operations Works in Replacement of Condenser and Compresser..

The Problems & Concerns;

  1. Low Main AC and Condenser performance
  2. Overhauling HVAC system
  3. Replacement of Condenser &AC
  4. Leak testing
  5. System renewed and commissioned

 

The Findings & Solution:

Main AC compressor SMC106S & condenser of HVAC System 2 were disconnected & transported to our workshops for overhauling works & pressure testing respectively.

After successful overhaul, System #2 Compressor, Condenser & motor are to be reinstalled in position.

Instead of the usual operation location in shipyards, this major operation was completed at a port instead by our field engineers in 2 separate calls.