Case Study – Maintenance Program for SMC106S, CMO28/26 Compressors

Banner-Case-Study-lng-akwa-ibom

 

 

 

lng-akwa-ibom

VESSEL DETAILS

Name : LNG Akwa Ibom
Type: LNG Tanker
Construction year : 2004
IMO: 9262209
Carrying Capacity: 142656 m3 Liquid Gas
LOA: 288.74 m
Width: 48.06 m

Service Location: Tuas, Megayard, Singapore

 

As per OUR 5-STEPS FORMULATION..

The Problems & Concerns;

  1. Compressor not able to start
  2. Suction, discharge and oil pressure abnormal
  3. System not able to cool despite all parameters are running fine
  4. Cooling deficiency

The Findings & Solution:

Overhauling of the main AC as well as HVAC maintenance program for SMC106s, CMO28 & 26 Compressors were proposed.

After close inspection, our engineers’ troubleshooting solution was also to overhaul the main AC while multiple spare parts were required for replacement.

 

Roger-international-General-Operation-Process
Case Study - LNG AKWA IBOM2

The scenario..

This was a case of general HVAC malfunction. Low performance of the system was due to the main AC, auxiliary ACs and Packaged units. Hence, general HVAC maintenance and installation services were proposed. After close inspection, our engineers’ troubleshooting solution was to overhaul the main AC while replacing the auxiliary ones and PUs.  

Through several years of experience, we have developed unique and efficient overhauling operations for 10.000, 15.000 and 20.000 operating hours compressors. We thus know which parts have to be replaced and which operations have to be conducted. In addition to overhauling, we decontaminated the compressors with nitrogen flushing.

After general parts renewal and cleaning of the main AC as well as installation and connection of the new units, we provided our client with a refurbished and retrofitted system. Thanks to our well organized stock management, we were able to provide our client with all required spare parts without delay.

 

What you need to know about upgrade maintenance kits

Higher efficiency & reduced costs

Moreover, thanks to a software upgrade for the Unisab III control unit, you can expect maximum uptime as well as boosting the cost savings you can achieve on your compressor operating costs.

 

A Responsible solution to your problems

At Roger International, we believe in a sustainable industry. As such, we implement an environmental-friendly logic to our Business.

related-sabroe-maintenance-services

Our sabroe maintenance programs

similar cases:

 

IN CHINA, YOULIAN SHIPYARD

Service: AHU Coil Renewal

Vessel: MAERSK LIRQUEN

yiulian-shipyard-AHU-renewal-work

 

hongkong RIDING CREW SQUAD …

Service: AHU Coil Renewal

Vessel: SANTA INES

Riding Crew Squad

 

Related case study

Service: Low Cooling Efficiency and AHU Renewal Works

Vessel: MONTE PASCOAL

Case-Study-Monte-Pascoal2

Want to find out more about the services involved in this Case Study?

For more information on the process of the services involved, click on the button below to download our FREE Case Study PDF version.

 

DOWNLOAD THIS CASE STUDY PDF VERSION HERE FOR FREE

RELATED SERVICES & Products

air-compressors
Service Rendering on Air Compressors

Air Compressors

Compressors
Service Rendering on Compressors

Compressors

Managing Package Units
Service Rendering on Package Units

Package Units

Spare Parts
Spare Parts Replacements

Spare Parts

BOOK NOW FOR A FREE INSPECTION + GET 10% OFF OUR SERVICES

To eligible for a FREE inspection, all you have to do is to fill up the form below today.

Should u require any parts change or repair works done, we are pleased to inform that we will be extending a 10% off to you if you use the form below.

We are here to resolve any issues that you might be facing and to stay fully committed to supporting you and your crew throughout these challenging times.

 


    * All attending personnel at all location areas will be screened as safety precaution.
    * Through this channel, we are also extending a 10% off any services that you may need.

    error: Content is protected.