Case Study – Low AHU Performance & AHU Renewal Work

Case-Study-Monte-Pascoal

 

case-study-monte-pascoal-vessel

VESSEL DETAILS

Name : Monte Pascoal
Type: Container Ship
Construction year : 2005
IMO: 9283203
Carrying Capacity: 4000 TEU
LOA: 272M
Width: 40.01M

Service Location: Tuas, Megayard, Singapore

As per OUR 5-STEPS FORMULATION..

The Problems & Concerns;

  1. System leakage
  2. Evaporator leakage and cannot be identified
  3. System not able to cool despite all parameters are running fine
  4. Cooling deficiency

The Findings & Solution:

The old AHU system was found to reached an advanced stage of corrosion, especially the coils and the blower. Contaminants were also found in the system.

To install and replace the ship’s AHU as the old unit is malfunctioning due to wear and tear.

 

Roger-international-General-Operation-Process
LinkedIn_Case Study-Monte-Pascoal

The scenario..

We conducted operations on the ship’s AHU Unit.

As per our 5 steps flow set up, we first identified the problem; the old unit reached an advanced stage of corrosion, especially the coils and the blower. Contaminants were also found in the system.

As such, we offered the ship managing team our AHU installation services. We first had to safely dismantle and remove the old AHU.

Afterwards, we provided the solution which was the positioning and installation of a brand new AHU with new piping and brazing works included.

Our technicians conducted air balancing operations to test and adjust the blower. They also accomplished programming works on the PLC.

Thanks to our engineers’ expertise, all programming and commissioning works were done without any instructions or manuals. The commissioning finally deemed the system functional.

similar cases:

 

IN CHINA, YOULIAN SHIPYARD

Service: AHU Coil Renewal

Vessel: MAERSK LIRQUEN

yiulian-shipyard-AHU-renewal-work

 

hongkong RIDING CREW SQUAD …

Service: AHU Coil Renewal

Vessel: SANTA INES

Riding Crew Squad

 

Related case study

Service: Maintenance Program for SMC106S, CMO26 & 28 Compressors

Vessel: LNG AKWA IBOM

Case-Study-lng-akwa-ibom

Want to find out more about the services involved in this Case Study?

For more information on the process of the services involved, click on the button below to download our FREE Case Study PDF version.

 

DOWNLOAD THIS CASE STUDY PDF VERSION HERE FOR FREE

RELATED SERVICES & Products

Heat Exchanger and Evaporator Coils

blowers-fans
Service Rendering on Blowers and Fans

Blowers and Fans

air-handling-unit
Service Rendering on Air Handling Unit

Air Handling Units

BOOK NOW FOR A FREE INSPECTION + GET 10% OFF OUR SERVICES

To eligible for a FREE inspection, all you have to do is to fill up the form below today.

Should u require any parts change or repair works done, we are pleased to inform that we will be extending a 10% off to you if you use the form below.

We are here to resolve any issues that you might be facing and to stay fully committed to supporting you and your crew throughout these challenging times.

 


    * All attending personnel at all location areas will be screened as safety precaution.
    * Through this channel, we are also extending a 10% off any services that you may need.

    error: Content is protected.